Project Description This design use of PLC for the substation of the simulation module of the simulation was carried out in the collection, and monitoring interface to monitor the use of PLC for the substation of the number of modules in the switch control, the use of force-controlled technology to monitor configuration software interface design, and publishing in the Internet interface, remote control. Supervisory Control and Data Acquisition (SCADA) system is the primary source of data for many activities in an electric utility. The whole project is monitor by SCADA.
Applications
Substation Power distributuion
For..
Electricals, Instrumentations, Power Electronics and systems, Industrail safety
Technologies Used
DMS based SCADA

Fill the form to get more details of the project

Looking for Project training with 100% genuine placement Assistance??!!
Contact Us